Rubber flooring in the garage, to protect from any more spillages
One heating vent pipe in. Internal garage door framing. Fused spur for heater
Pipework a go go inc. Temporary system drains.
Progress.
Finally a weekend that felt like a lot of progress. Bathroom door and front panel, kitchen plinth and unit in. So many things that needed coordinating.
In the ongoing series of overthinking things, i rodent proofed a gas dropout by heating a metal mesh with a blowtorch and melting into the pipe.
Also finished door cladding, added a handle to it, added end panel to kitchen unit, added sockets inside cupboard for fridge shore power, and on end of kitchen unit so usable when outside. Cut back panel for kitchen unit but won't fit until kitchen is sorted.